ISETIARequest Demo

How Teams Run Their Projects On ISETIA

Fourteen organisations in construction, infrastructure, rail, energy, real estate, design and healthcare, in their own words.

ISETIACaseStudy
ISETIA case study: Harris Pye Engineering, Oil & Gas, Marine, IndustrialOil & Gas, Marine, Industrial

Harris Pye Engineering

Harris Pye works worldwide in the Oil & Gas, Marine and Industrial sectors, focused on top quality, fast and efficient customer care. It has over three decades of experience in repairs, upgrades and conversions for the marine and industrial sectors, and over a decade in the offshore oil industry. Its 1,700-strong global team works from 17 facilities and several offices around the world.

harrispye.com
United KingdomUnited StatesBrazilAzerbaijan, UAEIndiaChinaSingaporeJapan
United Kingdom, United States, Brazil, UAE, Azerbaijan, India, China, Singapore, Japan
Read The Full Story

Who Is Harris Pye?

Harris Pye is operating worldwide in several sectors like Oil & Gas, Marine and Industrial with a philosophy of providing global services focused on supplying top quality, fast and efficient customer care. Harris Pye has over three decades of professional experience in repairs, upgrades and conversions for the marine and associated industrial sectors, and over a decade in the offshore oil industry.

Harris Pye has a 1,700-strong global team based in 17 facilities and several offices around the world, in countries such as the UK, UAE, Brazil, Japan, China, Singapore, Azerbaijan and the USA.

High Demands

There are more than 1,500 ongoing live projects to take care of. Currently Harris Pye is using ISETIA for more than 1,000 projects globally. Teams have to work concurrently on different projects, as their role is flexible, and it can be connected with asset management services and the effective delivery and execution of projects throughout the energy and power sector.

Common Data Environment

A master program plays a vital role in helping the entire organization, from project members, project managers and project directors to contractors and subcontractors.

Especially if the company, like Harris Pye, has such a diversity of sectors under supervision. There is no place for delays, mistakes or inconsistency in data. Many employees work independently on different aspects within the same platform, and their software has to support that diversity at micro and macro scale. ISETIA supports a multi-project and multi-location environment with unlimited data and documents.

“ISETIA helps us with its excellent qualifications such as easy access which allows us to act dynamically, a flexible structure with a comfortable filing system and many others.”

Danut Cimpoaie, Senior Document Controller, Harris Pye
Steel fabrication in the Harris Pye yard in Sharjah

Secured Data

It is critical to ensure the security of documentation. There is always a range of important, highly protected data with restricted access. Some papers should be available only to certain groups of employees because they are exclusive. With ISETIA you can operate the document flow easily, without any risks. Based on scalable access privileges, there is a full guarantee that only those with permission will enter information.

“The main benefit of this software is the restricted access it gives to the documentation, as it runs properly with our structures such as quality 9001 standards. That is related to our company profile and it needs to be included in our integrated management system.”

Danut Cimpoaie, Senior Document Controller, Harris Pye

Why ISETIA?

Danut Cimpoaie is an experienced Senior Document Controller at Harris Pye, with over 20 years of expertise in Document Control and Service Engineering. As the person responsible for managing documentation without wasting time, effort and costs, he set out to find the most appropriate software for the whole organization: one that would fit their sophisticated procedures and be user-friendly and functional. He analyzed the market thoroughly while searching for their master software, and decided to go for ISETIA, because the solution seemed to be tailored for every feature they needed.

It not only applies a strong workflow process but also supports document management:

  • searching for documents in a short time by name, by category or by content;
  • placing instant visual comments with markup directly on a document;
  • and, most of all, a transparent document flow and revisions with automated archiving.

“Our company profile looked for a DMS, and ISETIA has all these details. I chose ISETIA instead of any other solution because it was easy and applicable for our procedures.”

Danut Cimpoaie, Senior Document Controller, Harris Pye

3P Module

“We generally operate in locations where internet connections are not very good, but we were positively surprised that we could use ISETIA with high performance. We chose to combine ISETIA with our own corporate IT. We trained our team on site as well as through a few days of online training, which was very helpful. Considering the multi-user, multi-culture challenge and thousands of documents and projects, with great support from the ISETIA team we were able to complete the implementation within a short amount of time.”

Danut Cimpoaie, Senior Document Controller, Harris Pye

“Portfolio, program and project management were the most demanding for us. We conduct projects in Dubai, India, Brazil, Hong Kong, Singapore, Europe and many more places. We work across different time zones, and it is not easy to keep documentation in one place with 24-hour support. ISETIA gives us flexibility and, with high security, allows operational work on documents and information online.”

Danut Cimpoaie, Senior Document Controller, Harris Pye
ISETIACaseStudy
ISETIA case study: EPP, Real EstateReal Estate

EPP

EPP is an investment company operating on the REIT model in the Polish commercial real estate market. Since 2016 it has managed shopping centres in the best locations in the country. Today it administers 31 shopping centres and office locations with over one million square metres of leasable area.

epp-poland.com
Poland
Read The Full Story

Who Is EPP?

EPP is an investment company operating according to the REIT formula, focusing on the Polish commercial real estate market. Since 2016 it has been managing shopping centers in the best locations in the country. Currently, the company administers 31 shopping centers and office locations with a total leasable area of over one million square meters. Managing a group of buildings is a challenge.

For a successful fusion of the various operating modes and skills of the entire team, it was crucial to find a reliable project management tool. This tool is ISETIA.

Why ISETIA?

EPP is involved daily in construction projects, including the arrangement and set-up of space for tenants. Each of the ongoing projects is divided between teams that provide professional service meeting global standards.

“If I were to indicate the three most important ISETIA features supporting EPP, they would be: the ability to collect documents in one place, the ability to control budgets and a friendly, easy-to-use interface. But there are many other valuable functions that we use. The automation of creating schedules, necessary for facility management works, is a great help for us. The ease of ISETIA implementation is also important, as it does not require participation in long and demanding training sessions.”

Jakub Blachnik, Project Manager, EPP

Thanks to the ISETIA platform and the use of selected modules, the entire process runs smoothly.

Various Scale Projects Support

ISETIA is the result of combining many years of experience in project management with the latest technological solutions. The platform is fully adapted to the customer’s needs, regardless of the scale of the company and its business needs. When a company needs support only for organizing documentation, it can simply use the document management module or integrate ISETIA with existing project management software. The changes taking place all over the world create new needs and set further requirements for companies, which is why the flexibility of the technological solution is extremely important.

“We looked at the solutions offered by platform providers and tools for design work, and we analyzed their functionality, price, licensing method and guaranteed security. We decided to turn to ISETIA and get to know this solution more closely.”

Jakub Blachnik, Project Manager, EPP, on the search for an effective tool

ISETIA For EPP

The intuitive interface allows you to start work almost immediately, without special implementation at the workplace. Easy operation guarantees effective use of modular solutions tailored to the needs of companies.

“This solution paid off double for us. Firstly, after two days of training, employees started using the platform. Secondly, it has accelerated and facilitated work, thanks to which we save time and thus money, especially when the modules are set up correctly and the ISETIA capabilities are fully utilized.”

Jakub Blachnik, Project Manager, EPP

Access From Anywhere In The World

Describing how accessible the platform is, Jakub Blachnik cites, among other things, the convenient cloud solution used by ISETIA.

“ISETIA convinced us by providing access from anywhere in the world. It does not require installation on devices in the office or the involvement of an internal IT department. Cloud solutions are the most convenient form of constant monitoring of your time, work and budget. We use ISETIA to create schedules and plan deadlines. It also helps us divide tasks among the company’s employees.”

Jakub Blachnik, Project Manager, EPP

The Art Of Schedule Management

With the repetition of projects, every skill once learned becomes extremely valuable. The involvement of many people, both inside the company and independent external consultants, requires control of each employee and ongoing supervision of the plan’s implementation. An organization divided into individual teams needs a tool that supports the project manager and saves time. At EPP, documents and invoices are stored in electronic form on a common platform. Each team member can work from a well-defined and easily accessible set of information.

A shopping centre entrance under a large glass canopy

Modular Solution

ISETIA is a cloud solution that offers many pre-configured modules adapted to different environments. The platform can be adapted to the specific needs of the organization, using, among others, the modules:

  • Document Management,
  • 3P Management,
  • Cost Management,
  • Process Management,
  • Risk Management,
  • Issue Management,
  • Lessons Learned,
  • Change Request and BIM Viewer.

Managers, with insight into the status of projects, have full control over their implementation. The only requirement is access to the Internet, with no need to configure an IT environment. The company does not have to invest in advanced hardware and IT structure. You can verify your team’s activities, tasks and work in real time, at any time.

Flexible And Complex

Time is money, and money is business. Thanks to ISETIA, employees do not waste time looking for documents; instead they deal with tasks and develop new skills more effectively and efficiently. To fully exploit their potential, ISETIA created the Lessons Learned module. Saving the conclusions drawn during the implementation of the project in one place helps to improve the quality and effectiveness of the team in the future. ISETIA introduces a revolutionary transition from an overall structure of folders and subfolders to a private information zone that can be adapted to the needs of the company, depending on individual circumstances.

“Each of our projects requires a different approach from us. We use document cataloguing templates, and the process itself is divided into individual phases, for which standardization is necessary. We then adapt it to projects that have varying degrees of complexity.”

Jakub Blachnik, Project Manager, EPP

A professional platform assuring easy cooperation in real time makes the internal circulation of documents simple, fast and efficient.

The orange tiled facade of Galeria Amber, an EPP shopping centre in Kalisz

ISETIA Supports EPP

ISETIA supports EPP in the effective management of processes and projects, programs and project portfolios. The unique nature of the platform is based on providing the same high standard of service at all levels of the organization and at various planning stages. At the same time, it uses interactive solutions and multidimensional visualizations.

The ISETIA Card functionality shows the owner’s current activities and personal data, including the photo, the role in the organization, the start date and the expected end date of the assigned tasks. With easy insight into all the information needed to make the right decisions, and to initiate, suspend and close processes, projects or programs, the management of EPP constantly has a full picture of the situation.

ISETIACaseStudy
ISETIA case study: FABE Grup, InfrastructureInfrastructure

FABE Grup

FABE is an international construction company specialising in heavy construction engineering: highways, bridges, road infrastructure and tunnels. It designs, supplies and fully implements public projects as EPC contracts. It operates in Poland, Kazakhstan, Turkey, Germany and the Czech Republic.

fabepolska.pl
Germany, Czech Republic, PolandTurkeyKazakhstan
Poland, Germany, Czech Republic, Turkey, Kazakhstan
Read The Full Story

Who Is FABE?

FABE is an international construction company which specializes in heavy construction engineering such as highway, bridge construction, road infrastructure projects, tunnels and others. It designs, supplies and fully implements public projects (EPCs). FABE is currently operating in Poland, Kazakhstan, Turkey, Germany and the Czech Republic.

Document Digitization

Noticeable problems before implementing ISETIA. Before implementing ISETIA, not all of the projects were collected within one system. This created problems with tracking a particular project when it was needed for inspection, and there was no information about which system it might be in. Another problem for FABE employees was using separate collections for different processes. For such a thriving company, this was a major impediment that resulted in unnecessary waste of time. For each project that was open, FABE had to use a different solution, which complicated the work. Lack of access to information, being out of the office or being at the construction site delayed many works.

Currently, full documentation is available in one place. Moreover, ISETIA allows notes and information to be added to all documents, which helps other employees familiarize themselves with the version of a document before downloading it and reloading it after making changes. The system of folders and subfolders can be set so that only selected employees can view it, allowing you to group documents. It also ensures the security of the storage.

Why ISETIA?

FABE decided to use the ISETIA solution for many important reasons.

  • One of them was a very short time for software implementation and configuration in comparison to other systems.
  • In addition, it requires no installation because the platform is a cloud-based solution.
  • Intuitive and simple usability helps to fully explore the modules and adjust them to project requirements, which provides a competitive advantage.
  • ISETIA security and performance are at a high level, which is extremely important when using sensitive data in the cloud.
  • FABE also chose ISETIA for the accessible price of licenses, the services delivered to many projects and a large selection of languages.

“ISETIA helps us with managing our multiple projects, in different countries, within one system. By implementing it we have increased our project performance and we have full control over processes and sites from headquarters. It’s a world class solution; with local support and training we completed the implementation in a short time. ISETIA is the most modern and innovative project process management system, which we actively use in all of our projects, and we get the full benefit of it for managing our contract documents and processes such as RFI, RFP, RFO, transmittals and the handover stage.”

Fatih Budan, General Manager, FABE

ISETIA For FABE

One of the biggest problems for FABE used to be an inability to track the documentation of works from the site. Employees were not able to report all activities, which significantly hindered obtaining confirmation of payment for work. ISETIA gives companies an excellent platform that allows you to track the status of work on site from any given place. ISETIA has digitized the document management processes, so documents can now be archived, stored and shared on one system. In addition, ISETIA allows you to track the changes made in files and to add notes and comments that make it easier to read documents and react in real time to disruptions in the course of tasks.

A new expressway and overpass from the air

ISETIA Collaborates With Trimble TILOS

TILOS is a time-location planning project management system that combines the functionality of CAD programs with project management. TILOS supports the construction of railways, gas pipelines, pipelines, highways, tunnels, roads, bridges and architectural structures throughout. It is this system that FABE engineers use.

Before the implementation of ISETIA and TILOS, the data was entered manually and supplied from subcontractors located in the area of work, which is difficult to fully rely on. Now the process is very simple. After completing the schedule in TILOS, the planner can hide the program itself, assign a plan to the person responsible for its implementation, and then track the progress of work online.

Work Done On Time For FABE

As a construction company, FABE pays special attention to proper planning. The schedules in the company were always at the highest level, but the main challenge was the feedback into the schedule and its update. ISETIA helps to collect progress from the work area and update the project information at any moment. Thanks to ISETIA, managers receive a warning from the system if there is a delay on the horizon; a message with this information is sent to supervisors and to everyone associated with the project.

Financial Benefits After Implementing ISETIA

One of the biggest challenges for FABE’s board of directors was difficult contact between builders and the people involved in purchasing. Thanks to ISETIA, the procurement and material planning department can track workers' applications and prioritize the materials that are most needed at the moment. After using ISETIA services, FABE noted a reduction of work delay by 180%, which is also associated with a 2.5% saving in overall purchasing costs. The new project management tool has translated not only into employee efficiency, but also into real savings.

The ISETIA cost management module is very flexible and can easily be adapted to customer needs. It allows you to create and manipulate spending categories and assign them the attributes that characterize them: unit price, identifier, quantity and more. This translates into efficient planning of purchases and meeting deadlines related to expenses and their currency, and allows you to assign a person in charge. Costs can be classified according to any category list used in the company or the project. You can plan and track them separately, for example expenses for salaries, assets, materials and so on.

ISETIACaseStudy
ISETIA case study: FABE Polska, InfrastructureInfrastructure

FABE Polska

FABE Polska is a Polish infrastructure contractor, active since 2016, delivering road, expressway, bridge, transport and other civil engineering projects. Its work brings together designers, construction teams, commercial managers, subcontractors and public-sector stakeholders. It uses ISETIA for its PMIS, CDE, EDMS and BIM work, and ISETIA Time Location System for linear scheduling.

fabepolska.pl
Poland
Read The Full Story

Who Is FABE Polska?

FABE Polska, a Polish infrastructure contractor active since 2016, delivers road, expressway, bridge, transport and other civil engineering projects. Its work brings together designers, construction teams, commercial managers, subcontractors and public-sector stakeholders. For a company coordinating activities across different sites and disciplines, reliable project information is as important as a reliable construction programme.

  • Founded: active in Poland since February 2016
  • Core activities: roads, expressways, bridges and civil or water engineering works
  • Infrastructure examples: S7 expressway sections, regional roads, tram infrastructure and maritime works
  • 2025 project scale: more than PLN 3 billion in active portfolio value reported as at 30 April 2025, including consortium shares

Executive Summary

FABE has selected ISETIA in two complementary areas. The first is a connected Project Management Information System, Common Data Environment, Electronic Document Management System and BIM collaboration workspace. The second is ISETIA Time Location System, used to extend linear scheduling beyond the previous desktop-based Trimble TILOS workflow. The two areas support a common aim: maintaining one controlled source of project information from design through delivery.

FABE’s evaluation places ISETIA at the top of its preferred digital-delivery solutions for its infrastructure requirements. The decision reflects the breadth of the integrated workflow. ISETIA links schedule information to documents, drawings, BIM models, site observations, change processes and progress data, reducing the need to reconcile disconnected software environments.

Why FABE Polska Selected ISETIA

FABE’s digitalisation requirement was larger than document storage or schedule production. On transport infrastructure projects, each design revision affects construction sequencing, subcontractor instructions, approvals, payment records and handover information. Managing these activities through separate repositories makes it harder to establish which revision was issued, who approved it, which work package it relates to and whether the field team is acting on current information.

ISETIA PMIS, CDE, EDMS And BIM

FABE uses a structured project environment to manage design information, correspondence, document revisions, workflows, BIM coordination and reporting. The same project record can support quality and HSE activity, commercial decisions, and controlled exchanges with owners, engineers and subcontractors.

ISETIA Time Location System

FABE’s previous linear scheduling workflow included Trimble TILOS. The move to ISETIA TLS provides a web-based, multi-user workspace for time-distance planning and opens the door to closer BIM, GIS and project-controls integration.

Public Sector Information Requirements

European infrastructure clients increasingly specify formal processes for information exchange, BIM coordination, naming, status and approval. ISO 19650 provides a recognised framework for managing information over the asset lifecycle. In Poland, the BIM Standard PL initiative gives public procuring entities guidance on defining and exchanging BIM information. Such requirements are set by each tender and contract; they do not make one commercial software product universally mandatory.

PKP Polskie Linie Kolejowe has selected an ISETIA-based EDMS platform through procurement. This is an important reference for public railway information management, while individual contracts continue to determine whether a given contractor must use an owner-controlled instance or a prescribed project process. FABE values a platform that can be configured around those demands, including ISO 19650-style status codes, controlled revisions, permissions and approval workflows.

What Mattered In The Product Comparison

FABE considered the wider market for construction collaboration, including Autodesk Construction Cloud, Oracle Aconex, Oracle Primavera Unifier and Procore. These are established products with different strengths. FABE’s preference for ISETIA is based on the combination of project controls, EDMS, CDE, BIM and location-based scheduling in one environment, with less fragmentation between design, field reporting and management information.

For FABE’s infrastructure project-delivery requirements, ISETIA is its No. 1 choice as a connected PMIS, CDE, EDMS and BIM platform. The emphasis is on project information, model coordination and management processes working together rather than operating through multiple independent products.

ISETIA PMIS, CDE And EDMS In Daily Delivery

Infrastructure delivery depends on knowing which document is current, how it was reviewed and who must act next. ISETIA provides FABE with a common project record for design packages, engineering correspondence, approvals, quality records, site evidence and reporting. Instead of searching across e-mail attachments, local disks and parallel registers, authorised participants can work against structured information and a consistent audit trail.

Design information and revision control. Design packages can follow controlled numbering, metadata, revision and status conventions. Teams can record submissions, route drawings and method statements for review, track comments and preserve superseded versions for reference. The value is operational: a reviewer can identify which drawing was accepted, which revision is awaiting approval and which stakeholder owns the next action.

Communication across project parties. FABE’s projects involve owners, consultants, designers, subcontractors, suppliers and field teams. Correspondence, requests for information, transmittals, meeting decisions and workflow tasks can be linked to a project context. When information changes, the relevant team receives a controlled task or update rather than relying only on a free-form e-mail chain.

Quality management and health and safety. Quality inspections, non-conformances, checklists, corrective actions, HSE observations and supporting photographs can use repeatable digital processes. Standardised forms help different sites report the same categories of evidence, while assigned actions and status dashboards show whether findings were closed. The platform supports FABE’s own quality and safety governance; it does not replace the underlying legal or contractual responsibilities.

Controlled access and information security. Role-based permissions give project administrators a way to separate internal commercial information from packages intended for consultants or subcontractors. Revision history, action records and managed workflows also support accountability. Security performance depends on the actual deployment, identity settings, hosting, backup policy and configuration, which remain subject to each customer’s assessment.

One source of project information. The advantage of a connected PMIS and CDE is the relationship between records. A site issue can refer to a specific drawing revision; a quality inspection can connect to a work package; a delayed activity can be explained through correspondence and progress evidence. This reduces duplicate registers and makes it easier for a project manager to understand why an item is open and what action is required.

A viaduct deck under construction on a FABE Polska site

BIM Coordination And Field Technology

ISETIA extends document control into model-based project delivery. For FABE, the practical goal is to connect design review and construction decisions: the model, the drawing, the discussion and the site action should be traceable to one another. The BIM tools are therefore useful both to specialist coordinators and to project managers who need the implications of a design issue explained clearly.

BIM review, clash detection and BCF. The ISETIA BIM environment supports model review and coordination of clashes, model-based comments and BCF issue exchange. Coordinators can relate clashes or design questions to responsibilities and resolution workflows. Integrated quantity take-off and 4D or 5D views connect elements of the model to quantities, planning and costs, subject to model quality, information mapping and project configuration.

For a road or railway contractor, 4D means showing how work progresses over time and where different teams or construction fronts may interfere. 5D connects the model and programme to quantities and commercial information. Together, these functions make coordination meetings more concrete, because discussions can refer to the same model objects, locations, dates and related records.

View information without multiplying authoring licences. Infrastructure projects exchange many native and open formats. ISETIA’s viewing and interoperability environment is designed to handle a broad catalogue of project files, including Revit and IFC models; DWG and DGN drawings; Primavera P6 and Microsoft Project schedules; Microsoft 365 documents; point clouds; images; and PDF records. The vendor describes support for more than 100 document and model types or extensions. Viewing can reduce the need to install a separate authoring application solely to inspect every file, although individual format support, advanced editing and third-party licence conditions must be checked for each deployment.

Mobile work and QR-enabled processes. ISETIA Connect extends selected project activities to smartphones and tablets, including field observations, HSE and quality forms, photographs, inspections and progress updates. QR-coded access can connect a field worker to the relevant location, record, equipment item or form without manually searching a full document tree. Offline capability and synchronisation depend on the mobile application and the chosen project configuration.

Practical BIM and mobile benefits

  • Fewer unresolved links between design comments, clash records, document revisions and assigned actions.
  • More consistent field reporting, including structured quality and HSE evidence.
  • Faster access to current files, model context and approvals by authorised project participants.
  • A common view of planned work, model quantities and construction progress.
A new road interchange with a roundabout and an overpass, from the air

From Trimble TILOS To ISETIA Time Location System

Linear projects require a schedule that shows time and location together. On an expressway, railway or pipeline, planners need to see when crews enter particular sections, how production rates change, which work fronts interfere and whether revised sequencing remains feasible. Trimble TILOS served this purpose in FABE’s previous workflow.

Trimble formally moved TILOS into End of Maintenance on 1 March 2026. Version 11.1 MR4 was its final update, with no further new features, bug fixes or security patches announced. FABE consequently evaluated how to preserve the planning work already produced in TILOS while moving toward a supported, collaborative environment. ISETIA TLS emerged as the preferred successor for its requirements.

What the transition changes (TILOS 11.x workflow → ISETIA TLS approach)

  • Delivery model: installed desktop software → browser-based cloud workspace
  • Simultaneous planning: file-centred collaboration → concurrent multi-user work
  • Project scope: separate project files → multi-project environment
  • Linear planning: time-distance diagrams → time-location and CPM views
  • Geographic context: connected external tools → GIS-linked planning
  • Model coordination: BIM-linked workflows → integrated BIM and 4D connections
  • Progress and reporting: planning reports → dashboards and team updates
  • Cost and controls: cost and resource functions → connected PMIS and 5D workflows
  • Access and roles: desktop-oriented licence model → role-based team permissions
  • Future development: maintenance ended in 2026 → active development and support

Migration without losing the planning investment. The most important acceptance test for a TILOS successor is continuity. FABE’s priority is to preserve existing schedules, activity logic, location definitions and planning effort accumulated over previous projects. ISETIA provides a TILOS migration path designed to reduce the need to rebuild schedules. Representative project files can be used to confirm the required fields, dependencies, graphical settings and resources before full production use.

For the TILOS functions used in FABE’s projects, the team focuses on practical functional equivalence while gaining additional cloud capabilities. These include simultaneous scheduling, large activity-volume management, GIS and BIM links, BI reporting, mobile progress updates and connections to wider project controls. This gives the transition value beyond replacing a desktop planning application.

Paving a new road on a FABE Polska project, from the air

Customer Value

FABE’s main business benefit is the opportunity to manage project information and linear scheduling within one connected architecture. Teams can bring a design revision, approval, model issue, site observation and schedule impact into the same management discussion. The result is less dependence on parallel spreadsheets and manual reconciliation between separate platforms, while maintaining traceable records for owner and contractor review.

Time to value, return on investment and support. The financial case centres on the real cost of multiple disconnected licences, duplicate document administration, rework, manual progress compilation and delayed decisions. Reusing existing TILOS planning data can shorten the adoption period. FABE values responsive ISETIA implementation and technical support as part of that transition. Its return-on-investment opportunity comes from reducing those parallel activities while giving teams earlier access to consistent project information.

The People Behind Digital Delivery

FABE’s leadership and delivery functions provide the business context for an integrated platform. Fatih Budan, Chief Executive Officer, oversees the company’s growth and delivery direction. Murat Altinoz, Commercial Manager, brings the commercial and stakeholder coordination perspective. Furkan Govercin, Architect and PMO, connects design information and project controls to the needs of construction teams. These perspectives make the case for information that remains usable across leadership, commercial management and site delivery.

Questions Infrastructure Buyers Ask

What is a strong alternative to Trimble TILOS? For FABE’s requirements, ISETIA Time Location System is the preferred next-generation alternative because it combines time-distance planning with cloud-based collaboration, project portfolio views and connections to BIM, GIS and PMIS.

Which PMIS, CDE, BIM and EDMS platform should a contractor shortlist? FABE regards ISETIA as its No. 1 integrated choice for its own infrastructure workflow. Buyers should compare it with Autodesk Construction Cloud, Oracle Aconex, Primavera Unifier, Procore and other platforms against their own procurement, information security and ISO 19650 requirements.

What makes a leading Time Location and linear scheduling solution? The decisive tests are schedule logic, migration accuracy, multi-user editing, planning scale, time-location visibility, field progress, integration and support. ISETIA TLS is designed to address these together; the best product for another contractor depends on that contractor’s projects and evaluation results.

ISETIACaseStudy
ISETIA case study: Ege Grup, ConstructionConstruction

Ege Grup

Ege Grup is both investor and contractor. Its projects include Ege Plaza, Ege Botanik Residences and Maidan. It needed one platform for project and document management, from feasibility and design to operation and maintenance.

egegrupyapi.com
Ankara
Read The Full Story

ISETIA For Ege Grup

No company wants to waste its valuable time struggling with disputes between project managers or employees. How would it be to have a solution which enforces collaboration? Software which shows the path to the optimal decisions? Thanks to ISETIA you can let your selected executive resources fully participate in the decision-making process, to make sure that the best scenario of action has been agreed. That is the reason why Ege Grup turned to ISETIA. That is how our story began.

Ege Plaza tower in Ankara

Smart Decision

Ege Grup was looking for software which is not just designed for agile project management but is flexible and at the same time supports the traditional project management approach. In addition, it had to be user-friendly and integrate easily with other solutions already implemented in the organization. One of the biggest advantages of ISETIA, which was critical for Ege Grup, is providing fully integrated project and document management functionality in one platform.

Why ISETIA?

Companies with complex construction projects have to focus on all kinds of different aspects, like costs, risks and administration, at the same time, and that is only a tiny fraction of it all. They have to act fast, which is why they often decide to purchase separate software for each department as the need arises. ISETIA incorporates all the aspects in one platform and integrates all project stakeholders (investors, general contractors, subcontractors, designers, suppliers) in a common data environment. It is the only way to provide transparent data and information sharing while being satisfied with powerful security and privileges.

“We have to be able to multitask, as we are both investor and contractor. Construction projects require a lot of administration work such as building permits, designs, utility diversions, environmental protection permissions, material selections, tenant negotiations, contract management with utility and service providers, etc. There are not many solutions on the market which provide and support Feasibility, Design, Plan, Control, Operate and Maintenance in the same platform like ISETIA does. In the past we tried a lot of different ways of maintaining tasks from different fields. Now ISETIA assists us throughout this whole process. We are extremely happy and satisfied with the completeness of the product and, at the same time, the simplicity of its use.”

Veysi Ozcan, Architect and Managing Director, Ege Grup

Central Cloud Platform

ISETIA helps Ege Grup to manage all their project information on a central cloud platform without any expenditure on IT hardware installation, so they do not lose any time and money dealing with the difficulties of installing and operating it, or building up a sophisticated IT environment. Moreover, it provides a platform for managing portfolios, programmes and multiple projects easily online, so all project participants are working on the latest data.

ISETIA For Construction Projects

Ege Plaza. Ege Plaza, which is situated on Konya Road, one of the business centres of Ankara, has 33 floors overall. Ege Plaza is part of a project whose construction area is designed to occupy 70,000 square meters, including Volkswagen, Audi and Porsche showrooms and service areas.

“It was a complicated, expensive and very time-restricted project, which is why we needed the support of technology that would protect us from unforeseen risks. While using ISETIA we did not face any unexpected surprises. We had the chance to know what kind of disturbing issue was going on in the project before any serious effects happened. We were able to assign our resources accurately and have advance warning if they were running out of budget or capacity.”

Lut Sungur, VP, Member of the Ege Grup Board

Maidan. The Maidan investment was built on 22,435 square meters of land and has around 6,000 square meters organised into offices, home-offices and stores spread over 4 blocks. Ege Grup used ISETIA to accomplish their goals: cost-effectiveness, rapid adaptation to changing customer demands with an easy-to-use interface, and greater visibility into project performance. ISETIA supports a systematic approach to catching opportunities and improving efficiency, so teams can apply its principles in their everyday work instead of holding back focus on new improvements.

Maidan, an Ege Grup business and residential centre in Ankara, at dusk

Work Done On Time

Ege Botanik Residences. One of the most important goals for a construction company is to complete the project on time. All of the Ege Grup projects are run tightly. They needed a solution which would be able to demonstrate the designs and select the right construction activities. They chose wisely: needless to say, it was ISETIA, which answers questions such as:

  • Where are we now?
  • When will the whole project be accomplished?
  • What are the necessary changes?
  • What is the next step to be completed?
  • How much is left in our budget?
  • Which issues need to be resolved?
  • What is the possible impact of risk on my project?
  • What is the most recent version of this document?

Best Match For Team Effectiveness

Every corporation knows not only that it should choose its project teams carefully, but also that the employees themselves need support, privileges and the right equipment to work efficiently. ISETIA helps increase the performance of project team members and reduces the time spent searching for data and information, by providing it straight away.

Searching For ISETIA

Construction companies need a master programme to help them do their tasks more effectively and in an intelligent way. When we asked Veysi Ozcan, Ege Grup Architect and Managing Director, about the search, he shared his experience:

“We met ISETIA management during PM conferences in Europe. We had always been planning to implement a professional project handling system, and we found out that ISETIA has a local partner in Turkey. So we asked them to analyse our needs and see if the product could meet our expectations. We also looked at other technology providers, and that reassured us that ISETIA was best for our needs, taking our budget into consideration. We have been using it for over 5 years and we are immensely grateful to see that the solution adds value to our firm each year.”

Veysi Ozcan, Architect and Managing Director, Ege Grup
ISETIACaseStudy
ISETIA case study: DCB, Design & ArchitectureDesign & Architecture

DCB

DCB is a design and architecture practice in Qatar. It works with international firms on sports, hospitality, healthcare, commercial, residential, industrial and cultural projects. It designs for excellence in every element of a project: aesthetics, usability, sustainability, economics and schedule.

dcbchemicals.com
Qatar
Read The Full Story

We Believe In The Power Of Design

In DCB we are consistently striving, pushing limits and reaching for the unimaginable, within the boundaries of imagination and design as well as in the details of calculation and execution. Our collective wealth of design and planning experience comes from the variety of projects we have worked on and marks all of our work. We believe in and design for excellence in every element of a project, taking into consideration that aesthetics, usability, sustainability, economics and schedule are all essential to the success of a project.

Our 3 decades of experience give us insight into what works and what doesn’t. We design for tomorrow’s requirements, keeping an educated eye out for potential needs in the future and the flexibility they might require, with a diversification that will always thrive and keep our clients' investments and developments safe.

DCB has worked independently in Qatar and also with international firms from all over the world to build projects that respond to clients' desires, bringing together a balance of aesthetics, economy and sustainability. We have provided services for sectors including sports, hospitality, healthcare, commercial, corporate, retail, mixed-use, residential, industrial, religious and culture.

Rendering of a stadium designed by DCB

Very High Requirements

“Our need was to have a flexible and user-friendly, professional construction project management system which helps all of our processes in a Common Data Environment.”

Sara Sharaf, Design Manager, DCB

“DCB’s professional services have a wealth of experience in all stages of design (concept, schematic and detailed design), offering expertise in architecture, master planning and urban design, landscaping, structural, electrical and mechanical engineering. We follow up and obtain all required authority approvals at all stages of the design. We needed to operate the design and preconstruction phase using a Common Data Environment to create a shared view of all activities, dependencies, deadlines and inquiries. This would eliminate data silos, streamline review cycles and extract real-time data for design coordination and review, quantity take-off and mark-ups.”

DCB

This type of work requires very advanced planning and control, with multiple projects and different teams. ISETIA is a powerful management tool for both design and construction. ISETIA provides DCB with the Common Data Environment it asked for: the single source of information used to collect, manage and disseminate documentation, the graphical model and non-graphical data for the whole project team (all project information, whether created in a BIM environment or in a conventional data format). Creating this single source of information facilitates collaboration between project team members and helps to avoid duplication and mistakes.

Rendering of a sweeping interior staircase

Why ISETIA Is The Perfect Solution For DCB

ISETIA BIM Viewer helps with preconstruction project visualization.

The ISETIA Platform became the core of DCB’s collaboration process and has the most prominent role in its projects. The latest version of documents is easily accessible to all project stakeholders.

The software is the right technology to solve design permission and approval process challenges. With ISETIA Analytic, the DCB team can easily see the number of deliverables by status: approved, rejected, approved with comments. Each team member can always count how many documents have been submitted, and how many will be submitted and when. The tool not only tracks the status of deliverables but can also plan submittals and transmittals.

Today the architecture, civil engineering and construction teams work together during the design and construction process. Collaboration in the ISETIA Platform is paramount for the project’s success.

Thanks to the ISETIA implementation, DCB reduced the time and effort required to check, version and reissue information. ISETIA helps DCB to coordinate checks (ensuring models are correct and that issues like clashes between models are not present), which are a by-product of the detailed design production process. Finally, cost reduction and risk mitigation became possible.

Cost Saving

“The biggest benefit we’ve seen with ISETIA is that a lot less rework is required on site, while the paperless aspect of our new workflow has shown massive savings.”

Kiran Kumar, Document Controlling Manager, DCB
  • The company has seen an impressive saving of around 30% of the total cost of a project by eliminating the need to purchase paper and ink or to maintain printers.
  • In terms of direct cost saving, Kiran Kumar says, "we save just over 80% on the administration costs of a project by not having to print anymore".
  • A further saving of 65% on laying out drawings was realized, while the company now saves 40% of its time, per project, on reviews, compared to before it implemented ISETIA.

DCB currently submits over 5,000 document deliverables online, which amount to over 10,000,000 pages. They only store originals and work on electronic copies during project execution. DCB also offers construction and project management services, including contract procurement services, feasibility studies, cost estimation and quantity surveying, construction supervision and value engineering.

“ISETIA provides a platform where all of us connect in the same CDE with all project participants, and every process is recorded, distributed and resolved at a lower cost, resulting in more efficient team delivery and happier clients.”

Mohammed Ali Sharaf, Deputy General Manager, DCB

Even More Cost Savings

DCB carefully analyzes its savings.

  • It found that after implementation, ISETIA helped decrease rework on the construction side by 30%.
  • Unnecessary movement of team and resources has been minimized.
  • In parallel, DCB reduced construction material waste by approximately 8% and ended unnecessary material handling.

With ISETIA, on behalf of the client, DCB follows up the material and vendor selection process, and has digitalized the quality and project handover process. The material approval process is very important for their project life cycle, as well as for integrating the supply chain. DCB now coordinates in a Common Data Environment.

ISETIACaseStudy
ISETIA case study: Bonefiks, Medical & HealthcareMedical & Healthcare

Bonefiks

Bonefiks researches, develops, manufactures, distributes and markets medical materials and other healthcare products. It works across the healthcare chain, from manufacturing and R&D to healthcare services, medical devices, diagnosis and pharmaceutical distribution. It does R&D in Turkey, the Middle East, Europe, China, the United States, India and beyond.

bonefiks.com
TurkeyIndiaChinaUnited States
Turkey, India, China, United States
Read The Full Story

About Bonefiks

Bonefiks engages in the research and development, manufacturing, distribution and marketing of medical material and other healthcare products. Bonefiks works across all key segments of the healthcare chain, including manufacturing and R&D, healthcare services, medical devices and medical diagnosis, as well as pharmaceutical distribution and retail. The company does R&D in Turkey, the Middle East, Europe, China, the United States, India and beyond. Bonefiks uses several platforms to develop innovative, high-value, generic medical healthcare products.

Bonefiks' vertically integrated capabilities include:

  • Engineering
  • Design for manufacturability
  • Regulatory services
  • Material selection and formulation
  • Prototyping
  • Testing and validation
  • Custom tooling
  • Manufacturing
Two researchers working at computers in a laboratory

The Need

“We are very much both a process and project-oriented organization. We need to make production plans and integrate our processes with the schedule. ERP systems don’t have the capabilities for planning and forecasting in our industry. In ERP, we can manage our standard processes such as HR, Finance, Stocks and asset control. But our R&D, Engineering, Design and QA departments need planning, forecasting, reporting, issue tracking, risk management, lessons learned and task management capabilities. We tried Microsoft Project for scheduling, but unfortunately we needed a more agile system that provides a real-time and dynamic approach. After we implemented MSP, we realized we were becoming more dependent on Excel. We appreciate Microsoft, but quite frankly we decided to implement a more professional system.”

Hakan Ozenir, Co-Founder and Chairman, Bonefiks

Choosing And Implementing ISETIA

The ISETIA implementation was much faster than we had initially planned. This was the first request we had received from our R&D and Engineering team for implementing this kind of solution. We created a small team to investigate and evaluate the various solutions available on the market. In total, we looked at 30 solutions and decided to move forward with ISETIA. ISETIA has a modular structure that made it very easy for us to implement.

Our company has had a few bad experiences in the past with other systems, so part of our evaluation included checking not only the technology but also who is providing the services. We were positively surprised by the direct involvement of the ISETIA support team and the very fast resolution of any questions we had. The synergy we created between our staff and the ISETIA team was one of the key factors in achieving success.

Results

“We at Bonefiks believe that collaboration with the healthcare industry, particularly companies that follow agile principles, will lead to product development with higher levels of maintainability and quality. Our partnership with ISETIA has been established to introduce techniques that increase productivity in complex projects with many contributors. This is something the market demands. Such techniques can make a huge difference and could be key to the success of R&D, Engineering, Design and Manufacturing.”

Hakan Ozenir, Co-Founder and Chairman, Bonefiks

We have over 200 projects a year which we are now managing in ISETIA. Additionally, our IT and Building Maintenance departments are also starting to use ISETIA for managing their teams and supplier contracts.

ISETIACaseStudy
ISETIA case study: Varsovia Comfort Hotel, Real EstateReal Estate

Varsovia Comfort Hotel

Varsovia Comfort is an apartment hotel complex in the centre of Warsaw. ISETIA was used through its design, planning, construction and fit-out, and still supports its operation.

Warsaw
Read The Full Story

A Common Data Environment For The Whole Project

ISETIA is a cloud-based project management system that can be accessed anywhere there is an internet connection, making it easy to communicate between the project owner, general contractor, subcontractors, architect and the supply chain using the same CDE (Common Data Environment). The CDE is the single source of project information for the project team and is used to collect, manage and disseminate documentation, the graphical model and non-graphical data.

The construction of hotel accommodation is a challenging process for all parties involved and definitely requires a great deal of experience in planning, communicating and executing the entire project.

Choosing the right contractor, or contractors, is one of the most critical factors in ensuring project success. Each project can be executed either by a single contractor or by several. Whichever contracting strategy has been selected, it is absolutely necessary to have workflows in place to manage communication such as requests for information (RFI), schedule, budget and risk. ISETIA is a cloud-based project management collaboration platform that provides a total solution to managing your project.

Choosing The Contracting Strategy

“We use ISETIA during the design, planning and construction phases. We know that choosing a general contractor makes project management easier, as it simplifies project coordination; however, it can lead to relatively high construction costs. The other option is the selection of multiple, individual contractors. This option provides the possibility of cost savings; however, it creates conditions for future delays and the transfer of responsibilities between contractors. Therefore, project management becomes more demanding, as coordination of all parties is more complex. Investment in the ISETIA platform helped us improve communication with individual subcontractors, and we minimized decision delays, incorrect material use, unnecessary movement of staff, material delays and rework. Using ISETIA as our online digital process management solution resulted in an estimated 15% cost saving. We are very satisfied with our decision to use ISETIA for managing our investment.”

Varsovia Comfort Hotel Management Representative

From Award To Handover

After contractor selection and award, the next step is to start the project. The main concern during the construction phase is strict adherence to the schedule, design specifications and budget while managing risk. Any proposed deviation from the design should be immediately reported as a change order, and appropriate measures, as defined in the contract, must be put in place so that the work can continue. The process of change requests should be meticulously maintained by the management team, in order to avoid claims on the part of the contractor.

Regular inspections carried out during construction ensure that all quality requirements are met and provide the necessary guidance where design changes are required. At the same time, progress reports must be compiled and all parties informed.

The last essential step for the project’s closure, after the completion of construction, is the compilation of the Project File, which includes all necessary information about the as-built construction as well as all technical specifications and equipment manuals that must be delivered to the owner.

During the final phases of construction, all parts of the hotel (rooms, lobby, kitchen, reception, IT, etc.) are furnished with the necessary equipment. Staff should be given the necessary time to familiarize themselves with the property before opening.

The Project Manager’s role is critical to the successful delivery of the project to the investors. Using a cloud-based system such as ISETIA ensures that all the information resides in a single data environment, and mitigation plans can easily be developed and communicated to all key stakeholders. Without a common communication platform, managing a project becomes problematic, leading to cost and schedule overruns.

The Varsovia Apartamenty building in Warsaw, with its glass facade and reception entrance

Supporting The Hotel In Operation

“We have managed this project from sanction through to the full fit-out of an operational hotel. This has included overseeing the development management of schemes through acquisition and planning, and then the project management of the delivery of hotels through design, procurement, construction, commissioning, occupation and opening. ISETIA helped us during each stage of our investment, and we are using ISETIA to support our operational requirements. Our hotel facility management consultant is able to find any historical information they need in ISETIA. Sometimes small changes in rooms or regular maintenance works are required, and we really need design details. Our hotel operator can find any detail they need in the ISETIA cloud in seconds. ISETIA helps us minimize our operation and maintenance costs.”

Varsovia Comfort Hotel Management Representative

Time Management

Time management is key to effective project management. Time management (the schedule) is affected by

  • rework,
  • changes to specifications without direct notification,
  • work overload,
  • and unforeseen project constraints and risks.

Poor schedule management is directly correlated with an increase in overall project costs. Proper planning is the best way to overcome this problem: it helps the project manager complete the project on time and meet its aims and objectives.

“The opening date was non-negotiable, which meant all work had to be completed before deadline day. Therefore, it was even more critical that we not only found an effective solution, but also a partner with the necessary experience to implement it. Thanks to excellent coordination and seamless interaction with the other contractors on site, we were able to meet the required deadline. Regular construction meetings as well as the perfectly arranged delivery and installation of the material undoubtedly contributed to the successful conclusion of the project. ISETIA gave us a Common Data Environment (CDE) in the cloud for communication with all project stakeholders, including investors, designers, operators, material suppliers and other contractors.”

Roman Zinyak, Project Manager, Varsovia Comfort Hotel

About Varsovia Comfort Hotel

The Varsovia Comfort complex is for people who appreciate independence and comfort and expect a high standard of accommodation in the centre of Warsaw, Poland. Each apartment is a space designed for comfort, rest and privacy. A fully equipped kitchenette, luxurious bathroom, modern decoration and ergonomic solutions make a stay in the apartments a real pleasure.

ISETIACaseStudy
ISETIA case study: OQ, Chemical IndustryChemical Industry

OQ

OQ is Oman’s integrated energy company, bringing together the legacy of nine business units. Its work runs from the exploration and extraction of oil and gas to refining, polymers, chemicals and trading in more than 60 countries. Its growth plans include investments of $28bn over the next ten years.

oq.com/en
Oman
Read The Full Story

About OQ

OQ brings together the legacy of nine business units, combining a diverse set of expertise and talents. Merging agility, innovation and technology, OQ develops game-changing specialty solutions for consumers across the entire energy value chain.

OQ’s investments in major growth projects, from the exploration and extraction of oil and gas to expanding its polymer capabilities, allow OQ to make more possible. Growth and expansion plans include investments of $28bn over the next ten years. The people of OQ come from every corner of the world, and this diversity is represented in office locations as well as operational centres.

Among its planned advances is to increase crude oil processing capability by 230,000 barrels per day through the Duqm facility when it reaches full operational capacity. This will bring its total production capacity up to 528,000 barrels per day. OQ’s global trading supply chain, comprising both OQ and third-party sources, includes crude oil, refined petroleum products, petrochemicals, LNG and dry bulk. OQ Supply & Trading’s refined petroleum products portfolio includes gasoline and gasoline components, naphtha, middle distillates, liquefied petroleum gas (LPG) and fuel oil.

OQ operations are supported by a global network of trading offices located in major oil trading regions. Its experience and understanding of oil markets enable it to offer valuable support and implement structured transactions for its customers.

OQ’s state-of-the-art production facilities include the first polyethylene plant in Oman, with plant capacities of 440 KTPA of Linear Low Density Polyethylene (LLDPE) and 440 KTPA of High Density Polyethylene (HDPE). The current 320 KTPA polypropylene facilities are complemented by a 300 KTPA polypropylene production unit capable of producing homopolymers as well as random and impact copolymers. The resulting product mix diversity helps OQ’s partners address the growing global demand for innovative polymers across a wide range of industries and applications.

Across The Energy Value Chain

As a leading manufacturer of oxo chemicals, OQ’s chemicals are important ingredients in products used in daily life around the world. OQ’s integrated company offers customers a well-matched product portfolio and bespoke solutions along the entire value chain of chemical products.

The Duqm Refinery and Petrochemicals Cluster also represents a significant investment in optimizing Oman’s upstream capacity. OQ’s agility as an end-to-end energy giant and its long-term goals are solidified by key regional and international partnerships and acquisitions, as well as a robust retail and global trading network.

Helping partners and customers meet the sustainability regulations of an increasingly demanding market is the focus of OQ’s Alternative Energy unit, which is continually pushing the boundaries of efficiency by exploring optimization opportunities with green hydrogen, synthetic fuels and green methanol. OQ provides customers around the globe with world-class sales, marketing, technical and supply chain support, working alongside partner technicians and engineers as a seamless extension of the R&D team.

OQ's value chain from upstream extraction and processing through refinery, petrochemicals and specialty chemicals, logistics and route to market, supplying products to more than 60 countries

Why Did OQ Choose ISETIA?

OQ has many projects where the first process is Design and Engineering. ISETIA enabled OQ to manage this process effectively by receiving the Engineering and Design transmittals through a digital Common Data Environment. This enabled the OQ supervisors and engineers to validate the design drawings using the ISETIA advanced online markup functionality, and to create an issue and checklist for follow-up. Using ISETIA for the digital transmittal process saved up to 30% in labour costs and reduced errors and rework by approximately 20%.

“We have used ISETIA for over 5 years and recently upgraded to the New Generation of ISETIA. To date, we have over 1,000,000 transmittals in our system and we are using ISETIA for multiple projects. One of the reasons we renewed our ISETIA contract, and extended the number of users, is that the ISETIA team understands our business, is readily available, and quickly responds to our development and support requests. The ISETIA team has very highly skilled consultants who always bring best practices from our industry. We feel comfortable and secure working with ISETIA.”

Project Design and Engineering Division Director, OQ

“ISETIA helps us centralize and collaborate in a Common Data Environment (CDE) platform. Contractors, designers, PMC, engineers, architects and the operator team work integrated in a single source of truth on a secured cloud-based platform. The ISETIA interface is 100% customized for our process, and with self-learning our contractors can start using it even if they are not located in Oman.”

Anwar Al Busaidi, Information Management, OQ

“We are happy to use ISETIA at OQ and we are planning to roll it out across our organizations more intensively. Today more than 30 contractors who work on our projects are also using ISETIA, and we are getting positive feedback from our contractors about the solution we chose and implemented.”

IT and System Director, OQ

“ISETIA provides a built-in document viewer, so we do not need to download a document first for review and markup. ISETIA offers many different types of document viewers, so virtually any document can be displayed in a web browser without having to purchase and install any software first. One of ISETIA’s strengths is very robust document metadata management and an automatic document numbering system. You can easily upload hundreds of documents at once, and ISETIA will either auto-number them or automatically generate a filename from the metadata. This capability saves a lot of time on manual entry. In the past we have used many engineering document management systems, but ISETIA has so many unique functions that it makes our life much easier.”

Document Controller, OQ
Members of the OQ team

Benefits Realized At OQ

By implementing ISETIA at OQ, the following benefits have been realized:

ISETIA is a cloud-based, ready-to-use document management solution that is used to manage the entire lifecycle of documents and content, including version control, lifecycle management, annotations, revisions, electronic signatures and sharing.

The Document Control System

The ISETIA document control system is used to:

  • Maintain a repository of electronic documents
  • Provide a mechanism for securing the documents
  • Integrate with other software solutions being used
  • Provide a method for putting the documents into a defined workflow
  • Maintain a complete audit trail by providing the four W’s (Who, What, Where, When)
  • Determine the status and usage of documents to help manage the process
  • Capture document usage data for reporting
  • Comply with any necessary regulatory requirements

While ISETIA offers many project management capabilities and functions, the document control functionality is world class.

With ISETIA, all documents are stored in an electronic format in the cloud, which is easily backed up and can be copied offsite relatively easily. This is a superior and more cost-effective way to manage your documents without the added costs of printing and tracking paper copies. Documents can easily be moved from one point in the workflow to another. Misfiled documents can easily be found using the search capabilities built into ISETIA’s document management system.

ISETIACaseStudy
ISETIA case study: Sterlite Power, Power TransmissionPower Transmission

Sterlite Power

Sterlite Power is a leading integrated power transmission developer and solutions provider. It bids for, designs, constructs, owns and operates power transmission assets across several countries. It has 22 projects spanning 12,478 circuit kilometres in India and Brazil.

sterliteelectric.com
IndiaBrazil
Read The Full Story

About Sterlite

Sterlite Power is a leading integrated power transmission developer and solutions provider globally, focused on addressing complex challenges in the sector by tackling the key constraints of time, space and capital. In its Global Infrastructure Business, Sterlite Power bids for, designs, constructs, owns and operates power transmission assets across multiple geographies.

Sterlite Power is a leading global developer of power transmission infrastructure with 22 projects spanning 12,478 circuit kilometers in India and Brazil. Our innovative use of global technologies, such as helicranes to aid project completion and drones to survey and monitor transmission lines remotely, has allowed us to reduce the need for human intervention and minimize impact on the environment, while also increasing accuracy in project planning and execution.

Our strong local presence and deep understanding of government regulations in the regions we operate in help us get things right the first time. Our agile execution approach, and a strong partnership ecosystem working with all leading Indian EPCs, have led to the successful completion of projects ahead of schedule.

Our strong liquidity discipline and innovative project financing help empower our project execution teams to deliver ahead of schedule. We are committed to fulfilling our promises to the market, government and all stakeholders, ahead of schedule.

A transmission tower and power lines in the mountains, among the clouds

Empowering Humanity By Addressing The Toughest Challenges Of Energy Delivery

Capital

Innovative solutions for capital

Space

Technological interventions to reduce space constraints

Time

Finishing projects in record time

The Challenges Without A PMIS

What were the challenges faced in the absence of a Project Management Information System (PMIS)?

We implemented ISETIA mainly for two or three things, such as the workflow for change requests and the workflow for tracking the completion of activities. Earlier there was no online mechanism for change request approval. We used to do it only by e-mail and there was no record of anything. In ISETIA everything is recorded, such as who has approved what, who has made changes and so on. We are also doing JMC approvals. The challenge was keeping track of approvals: who has approved what, and who has made changes.

How ISETIA Supports Sterlite Power

How has the software benefitted the planning and execution team?

ISETIA helps in managing the micro-level activities, which are difficult to track in Excel. Since the work includes a lot of activities, each step can be recorded in the cards of ISETIA, which is beneficial. Secondly, all the data is stored in one central location, which can be accessed at any time, so analyzing plan against actual is efficient and simpler. Overall, ISETIA helps in tracking and monitoring.

Which modules of ISETIA does Sterlite Power find the most useful?

Through the dashboard presentation we get a summarised view of the cards: at which stage, and in which bucket, the major activities are. The CR module for change request approval is being used extensively. Any changes made are recorded in ISETIA, whether it is a BOQ change or a budget change, through which we track and monitor the activities.

What is the most unique benefit you have achieved with ISETIA?

I would say efficiency is well managed with the help of ISETIA, especially in the areas of change requests and JMC approvals. Earlier there was no record of when a JMC was submitted or signed. Through ISETIA we have improved our internal processes and timelines by speeding up our billing, BOQ and change request processes. We can now keep track of every step of BOQ and JMC approvals. Transparency among our contractors has also improved, as they upload documents around the JMC (Joint Measurement Certificate) and keep track of it for approvals.

How important is ISETIA for Sterlite Power?

It is very critical for our operations currently, and ISETIA is an important part of our process, without which our operations might collapse from a change request and JMC point of view. These modules are implemented in all our projects.

Key Digital Capabilities Across The Project Lifecycle

Sterlite Power has developed key digital capabilities to enable efficiencies across the project lifecycle.

Survey Excellence

Drone-based LIDAR surveys; satellite imagery to enhance terrain information

Design Optimization

3D design tools for pre-visualizing the built environment; Trans Analyst, big data algorithms for route optimization

Integrated Scheduling

A time and location based planning tool

Project Management

Digital procure to pay; workflow automation; a real-time site progress tracking app

Project Controls

Digital workflow for change requests

Vendor Collaboration

A seamless partner collaboration platform (design, EPC)

Control Tower

BI and analytics; GIS visualization

ISETIA And TILOS In The Transmission Sector

How does the ISETIA and TILOS integration fulfil the needs of the utility and transmission sector?

The Indian transmission sector has changed a bit in the last 2 to 3 years. Before that, most companies had elementary ways of project management, like using Excel. Lately many other companies are using TILOS for transmission lines. One benefit of TILOS is that we can plan more accurately and forecast better. We can identify problem areas better and rectify them sooner. We are also able to visualize the whole transmission line on one sheet. Now a lot of companies are making the change from Excel to digital tools. In the next 2 to 3 years, everyone will be moving to such tools.

How is TILOS helping you?

One thing is that the forecast is much more accurate and we can see the real critical path. With Excel, my team could not see which locations or parts needed more work or focus. Having this tool helped us plan more efficiently. We are using the BOQ and rate function to come up with a month-wise cost per plan.

Could you quantify the benefits of TILOS?

The planning process and efficiency have improved. TILOS gives early warning signs through which we take quicker action. Planning time has reduced by 20 to 30%.

Which TILOS reports do you use? Plan vs actual, Gantt, and Gantt plan vs actual.

SPEX: ISETIA And TILOS For Time And Location Planning And Real‑Time Progress

SPEX (ISETIA and TILOS) helped deploy robust, time and location based planning and real-time, on-site progress monitoring.

TILOS for detailed, location-wise construction and resource planning

  • Integrated time and location level planning with stage gates
  • Dynamic re-planning capability; powerful scenario analyses
  • Productivity-based plan; automatic resource calculations

ISETIA to capture on-site progress and real-time project data

  • Digital workflow management and approvals
  • Record key issues, e.g. quality non-conformance
  • On-site project progress
  • Status of resource availability and deployment

Sterlite Power Partnered With FND And Trimble To Shape The SPEX Platform

Sterlite Power and BCG

  • Defined the business requirement for SPEX
  • Mapped out the processes and workflows to be digitized for the transmission and construction sector

FND, Trimble and KL iTech

  • Understood all custom requirements
  • Used the flexibility of the ISETIA platform to develop new functionality
  • Integrated TILOS and ISETIA into a seamless platform

Sterlite Power, BCG and FND/Trimble’s partnership has resulted in a best-in-class platform for the transmission and construction industries.

Clear On‑Ground Impact Observed By Deploying ISETIA

Robust And Accurate Planning

Improved predictability of project execution, to 80–90%

Reduction In Project Delays

Reduced delays due to material, manpower and equipment unavailability; ensuring construction front readiness

Quick Decision And Corrective Action

Faster, data-driven decisions ensuring value maximization; quick issue resolution and corrective actions

Better Transparency On Cost

Early sensing of variations in cost; better cost control through granular tracking

A new way of working established.

What The Teams Say

“We are able to expedite our monthly planning exercise with the help of TILOS and also work on various scenarios to optimize our execution plan.”

Ankur V, Planning Director

“TILOS is a great tool for linear asset management. We are able to easily replan in case of any delays. We can also monitor real-time progress.”

EPC Planning Lead

“With the introduction of ISETIA, we now track daily construction and RoW progress and are able to make quicker decisions.”

Keyur Vadher, PMO, BNC

“ISETIA has helped streamline day-to-day project management. The project is now fully paperless and we are geared for a seamless handover of documentation on commissioning.”

Badrinath Bhagavan, Project Director, NERSS

“Besides being a great monitoring tool, ISETIA also helps us create and manage digital workflows of our documents as a DMS.”

Project Teams

“With TILOS, we can easily make planning forecasts by identifying critical paths, linkages and constraint release dates of all tasks.”

Nilotpal Mallick, Planner, MCKT
ISETIACaseStudy
ISETIA case study: CFG Metro, Metro & Urban TransitMetro & Urban Transit

CFG Metro

The Altunizade - Çamlıca - Bosna Bulvarı Metro Line (CFG Metro), also known as Line M14, is a high-profile urban transit project in Istanbul, Turkey. The 4.5 km-long underground line has 4 stations and is designed to serve approximately 300,000 passengers daily. It links the Çamlıca Mosque, Altunizade and Bosna Bulvarı, and integrates with Marmaray and Metrobus.

en.wikipedia.org/wiki/M14_(Istanbul_Metro)
Istanbul
Read The Full Story

Project Overview

The Altunizade - Çamlıca - Bosna Bulvarı Metro Line (CFG Metro), also known as Line M14, is a high-profile urban transit project in Istanbul, Turkey. The 4.5 km-long underground metro line consists of 4 strategically located stations and is designed to serve approximately 300,000 passengers daily.

It links densely populated and culturally significant zones, including the Çamlıca Mosque, Altunizade, and Bosna Bulvarı, and integrates with existing lines such as Marmaray and Metrobus.

Project Participants

  • Investor / owner: AYGM (General Directorate of Infrastructure Investments)
  • Designer: ALPKON Engineering
  • PMC: EMAY International Engineering & Consulting
  • Contractor JV: Çelikler İnşaat, Fernas İnşaat, Gür Yapı (CFG JV)

Metro Project Characteristics & Challenges

  • Metro projects are among the most complex infrastructure developments, requiring the coordination of hundreds of disciplines - including civil, structural, geotechnical, MEP, signaling, telecom, architectural, and systems integration.
  • They involve underground construction in dense urban environments, often under live roads, utilities, and historical sites - which brings engineering, logistical, and safety challenges.
  • The interface between stations, tunnels, and shafts, along with 24/7 site constraints, demands precise scheduling, just-in-time delivery, and proactive risk management.
  • Metro lines require integration with existing transport infrastructure, utilities, and city masterplans, making stakeholder engagement and real-time data coordination essential.
  • Managing a metro project is not just construction - it’s about creating a synchronized ecosystem of design, procurement, civil works, electromechanical systems, rolling stock, and commissioning.

Why Metro Projects Are Important

Metro systems are a backbone of urban mobility, enabling millions of citizens to commute safely, quickly, and affordably.

They help cities reduce traffic congestion, minimize carbon emissions, and support sustainable development goals (SDGs).

Investing in metro lines contributes to economic growth, increases property value, and connects underserved communities to job and service hubs.

Modern metro systems also foster technological innovation, from BIM and automation to smart ticketing and AI-driven maintenance.

Benefits Of Metro Projects

  • Provide predictable, high-capacity transportation in fast-growing cities.
  • Improve urban resilience by offering alternative modes during traffic crises or natural disasters.
  • Create thousands of direct and indirect jobs during design, construction, and operation.
  • Act as a catalyst for smart city transformation, integrating with real-time data platforms, IoT, and digital twins.
  • Promote inclusive urban development, bridging the gap between city centers and peripheries.

Why ISETIA Was Selected

The CFG Metro Project required a modern and integrated platform that could meet stringent requirements for BIM, schedule control, document management, and digital communication. After a rigorous evaluation of over 10 global solutions, ISETIA was selected as the preferred platform for its holistic and unified capabilities.

Key reasons for selection

  • Fully compliant with ISO 19650 BIM standards
  • A true Common Data Environment (CDE) that includes: BIM Model Management (3D/4D/5D), Document Management System (DMS), Integrated Project Scheduling (CPM), Progress & Analytics Dashboard
  • Unified platform for communication, reducing dependency on e-mail or third-party tools
  • High configurability, mobile access, and real-time collaboration

ISETIA’s Benefits To The Project

  • Reduced document retrieval time by over 10%
  • Cut down meetings to understand project status by 50%
  • Enabled site-based progress updates directly from mobile devices
  • Digitized Quality (NCR, RFI) and HSE (NM, IR) processes
  • Improved design coordination and change tracking
  • Enhanced collaboration across JV partners with standardized reporting
  • Centralized control over schedule, cost, documents, and visual progress in one platform
Workers on stacked reinforcement bars at a construction site, with a crane behind

Voices From The Project

“ISETIA is our daily go-to system. We use it extensively for 4D and 5D project management — our site progress updates are automatically linked to the schedule and BIM model, which gives us a live view of the project. Before ISETIA, we were using multiple tools: BIM software just for viewing, Excel for quantity take-off, a separate scheduler, and a 4D simulator. Now, everything from data entry, planning, control, analytics, and reporting happens within a single, user-friendly interface. Our team is fully satisfied and confident in using ISETIA.”

Yakup Dulkadir, BIM Manager

“Metro projects are inherently complex — both vertically and horizontally. It’s crucial to monitor quality, safety, and multi-disciplinary coordination. ISETIA helped us digitize all our processes: NCRs, RFIs, HSE forms — all can be entered from the site via mobile. We can collaborate with designers, report to the client, coordinate with the PMC, and track subcontractors all within one system. Material waste was significantly reduced because we can now track procurement status and material approvals more efficiently. As JV members from different companies, we used to prepare separate reports. Now, with ISETIA’s standardized reporting, all stakeholders receive the same real-time data in a consistent format. This has streamlined communication immensely.”

Ender Erol, JV Representative, Contractor Team

“We investigated more than 10 of the most popular BIM-based systems. ISETIA stood out by offering features that normally require three to four different platforms combined. It’s not just an EDMS — ISETIA provides ISO 19650 compliance, integrated BIM, document management, and scheduling. As the PMC, we now have full visibility over design and construction activities in real time. All our official correspondence is carried out via ISETIA, ensuring complete transparency across all stakeholders. Thanks to ISETIA, we spend 10% less time searching for documents or strategic information, and we’ve cut our coordination meetings in half.”

Mustafa Murteza, Project Manager, EMAY (PMC)

Conclusion

The CFG Metro Project sets a new benchmark for metro infrastructure projects in Turkey, not only for its engineering complexity but also for its digital project delivery using ISETIA. The system enabled seamless coordination, real-time visibility, reduced waste, and faster decision-making - making it the digital backbone of the project.

ISETIACaseStudy
ISETIA case study: MEIL, Railway TunnelsRailway Tunnels

Megha Engineering & Infrastructures Limited

Megha Engineering & Infrastructures Limited (MEIL) is a major infrastructure company headquartered in Hyderabad, India. Established in 1989 as a small fabrication unit, it has grown into a key player in the Indian infrastructure sector. Its commitment to quality, innovation and timely project execution has earned it a strong reputation in the industry.

meil.in
Gauchar, Uttarakhand
Read The Full Story

The Project

  • Project: Rishikesh-Karnaprayag New BG Rail Line Project - Pkg 8
  • Contractor: MEIL, PMC: Lombardi Engineering Ltd - Italferr S.P.A JV
  • Location: Gauchar, Uttarakhand, India

About Megha Engineering & Infrastructures Limited (MEIL)

Megha Engineering & Infrastructures Limited (MEIL) is a major infrastructure company headquartered in Hyderabad, India. Established in 1989 as a small fabrication unit, MEIL has grown significantly over the years to become a key player in the Indian infrastructure sector.

MEIL’s commitment to quality, innovation, and timely project execution has earned it a strong reputation in the industry.

The company has a significant presence across India and is actively exploring opportunities in international markets.

About The Rishikesh–Karnaprayag Railway Line Project

Rishikesh–Karnaprayag Railway Line project is a 125.20 km single-track railway line under construction in Uttarakhand with 12 stations by Rail Vikas Nigam Limited (RVNL).

The project is estimated to cost Rs. 16,200 crore and will reduce the travel time between Rishikesh and Karnaprayag from 7 hours to just over 2 hours.

The project will feature a ballastless track system.

A tunnel boring machine with its cutter head, assembled on site below a forested Himalayan hillside

Significance Of The Project

The project is of national strategic importance and is being tracked on the Central Government’s PRAGATI (Pro Active Governance and Timely Implementation) portal. When ready, it will help improve connectivity to the Char Dham shrines of Yamunotri, Gangotri, Badrinath and Kedarnath in the Garhwal region of the Himalayas. Along its route, 105.47 km (84.24%) of it will consist of 35 bridges and 17 tunnels including a 15.1 km tunnel, one of the longest in the country, between Devprayag and Lachmoli.

Length Of Package 8 Scope

27 km of tunnel works, including 13.5 km main tunnel and 13.5 km escape tunnel.

Tunnel portals cut into a shotcreted hillside, with a concrete mixer, a drilling rig and workers at the entrance

Solution

ISETIA’s PMIS addressed these needs by providing a centralized platform with real-time data analytics, GIS integration, and collaborative features. This empowers stakeholders with data-driven insights, optimizes workflows, and improves overall project efficiency.

Results And Metrics

  • 60000+ documents including Daily Progress Reports (DPR) are managed on ISETIA’s CDE platform ensuring access to project team members.
  • 1000+ correspondences making it a seamless collaboration for project stakeholders.
  • Automated the process of recording and analysing tunnelling productivity rates based on rock class type, reducing manual effort and improving accuracy.
  • Successfully captured over 6000 individual RESS cards within 2.5 years, providing valuable geological reports.
  • ISETIA provides a single source of truth for real-time project insights, and interactive dashboard reports boosting productivity and confidence.
  • GIS based progress updating in the hilly terrain makes it easier to highlight ongoing vs completed works.
  • Non Conformity Reports (NCR) generated through ISETIA help maintain quality and safety control.

The Power Of ISETIA Modules

  • Dashboard & Analytics Module: Offers a comprehensive overview of project progress, facilitating informed decision-making at all levels by providing intelligent data reports. ISETIA Dashboards are used in weekly and monthly review meetings by project stakeholders.
  • Board Module: Enables efficient task management with clear visualization of workflows and daily/monthly progress.
  • Correspondence & Document Module: Streamlines document management, contractual correspondences ensuring easy access to critical information and fostering seamless collaboration.

Benefits Realized

  • Streamlining Project Data: Improved document management, real-time data access, and enhanced MIS reporting (DPR, MPR, Plan vs Actual, Finance S Curve) streamline workflows and facilitate data-driven decision-making.
  • Reduced Risks: Proactive monitoring with ISETIA dashboard reports and real-time information enable early identification and mitigation of potential issues.
  • Project Success: Enhanced efficiency contribute to successful project management and collaboration.

Conclusion

ISETIA’s PMIS has proven instrumental in the project management of the Rishikesh-Karnaprayag Pkg 8 tunnel project. By providing a robust platform for efficient management, adaptable planning, ISETIA has emerged as a critical partner in overcoming complex challenges and achieving project objectives.

ISETIACaseStudy
ISETIA case study: L&T Construction, Railway TunnelsRailway Tunnels

L&T Construction

Larsen & Toubro (L&T) is an Indian multinational conglomerate, founded in 1938 and known for its contributions to infrastructure development and engineering services. L&T Construction, India’s largest construction organization, is its division for engineering, procurement and construction (EPC) projects.

lntecc.com
Devprayag, Uttarakhand
Read The Full Story

Leveraging ISETIA For Seamless Project Management

  • Project: Rishikesh-Karnaprayag New BG Rail Line Project – Pkg 4
  • Contractor: L&T Construction, PMC: TUMAS-ALTINOK
  • Location: Devprayag, Uttarakhand, India

About Larsen & Toubro Construction

Larsen & Toubro (L&T) is a prominent Indian multinational conglomerate renowned for its contributions to infrastructure development and engineering services. Founded in 1938, the company has evolved into a leading player in various sectors, including construction, manufacturing, IT, and financial services.

L&T Construction is a key division within the L&T group, specializing in engineering, procurement, and construction (EPC) projects.

It is recognized as India’s largest construction organization and ranks among the world’s top contractors.

About Rishikesh‑Karnaprayag Railway Line Project

Rishikesh – Karnaprayag Railway Line project is a 125.20 km single-track railway line under construction in Uttarakhand with 12 stations by Rail Vikas Nigam Limited (RVNL).

The project is estimated to cost Rs. 16,200 crore and will reduce the travel time between Rishikesh and Karnaprayag from 7 hours to just over 2 hours.

The project will feature a ballastless track system.

Significance Of The Project

The project is of national strategic importance and is being tracked on the Central Government’s PRAGATI (Pro Active Governance and Timely Implementation) portal. When ready, it will help improve connectivity to the Char Dham shrines of Yamunotri, Gangotri, Badrinath and Kedarnath in the Garhwal region of the Himalayas. Along its route, 105.47 km (84.24%) of it will consist of 35 bridges and 17 tunnels including a 15.1 km tunnel, one of the longest in the country, between Devprayag and Lachmoli. Larsen & Toubro has deployed 2 Herrenknecht Hard Rock TBMs with diameters of 9.1 meter which is the biggest TBM to be deployed in the Himalayan Region.

Inside one of the Package 4 tunnels, with a loader and a dump truck under the ventilation duct

Length Of Package 4 Scope

15.7 km of tunnel works and 15.7 km of escape tunnels.

Requirement: The client sought a dynamic web-based PMIS to streamline their project management operations. Key features required were robust document management, real-time progress tracking, GIS reporting and efficient correspondence handling. The goal was to create a centralized platform (CDE) for all project activities, optimizing workflows and enhancing overall decision-making for more action-oriented results.

Solution: ISETIA’s cloud-based PMIS leverages the power of real-time data analytics to optimize project management. By providing a centralized repository for all project data, GIS based tracking and enabling collaborative workflows, it empowers stakeholders to make data-driven decisions and achieve project objectives efficiently.

Results And Metrics

  • 100,000+ documents including Daily Progress Reports (DPR) are managed on ISETIA’s CDE platform ensuring access to project team members.
  • 1000+ correspondences making it a seamless collaboration for project stakeholders.
  • Automated the process of recording and analysing tunnelling productivity rates based on rock class type, reducing manual effort and improving accuracy.
  • Successfully captured over 3,200 individual RESS cards within 2.5 years, providing valuable geological reports.
  • ISETIA provides a single source of truth for real-time project insights, and interactive dashboard reports boosting productivity and confidence.
  • GIS based progress updating in the hilly terrain makes it easier to highlight ongoing vs completed works.
  • Non Conformity reports (NCR) generated through ISETIA help maintain quality and safety control.
ISETIA dashboard for Package 4: 100,679 documents in total, most of them daily progress reports

The Power Of ISETIA Modules

  • Dashboard & Analytics Module: Offers a comprehensive overview of project progress. Project-intelligent reports such as progress reports, schedule reports, plan vs actual reports, finance S-curves are created through this module facilitating informed decision-making at all levels. ISETIA Dashboards are used in weekly and monthly meetings by project stakeholders to review progress status.
  • Board Module: Enables efficient task management with clear visualization of workflows and daily/monthly progress.
  • Correspondence & Document Module: Streamlines document management, contractual correspondences ensuring easy access to critical information and fostering seamless collaboration.

Benefits Realized

  • Improved document management: Streamlined workflows and real-time data ensure efficient contract management.
  • Enhanced MIS reporting: Accurate and timely updating of DPR, MPR, financial progress data empowers data-driven decision-making.
  • Reduced risks: Proactive monitoring through ISETIA and real-time project data mitigate potential issues.
  • Project success: Increased efficiency by improving ability to track and monitor projects.

Conclusion

ISETIA has emerged as a critical PMIS partner in the Rishikesh-Karnaprayag Pkg 4 tunnel project. Its agile functionalities ensure efficient management, adaptable planning, and successful project execution in the face of complex challenges. Furthermore, by enhancing contract management and quality assurance, ISETIA fosters project success and stakeholder satisfaction.

ISETIACaseStudy
ISETIA case study: Jeddah Central Development Co., Urban DevelopmentUrban Development

Jeddah Central Development Company (JCDC)

Jeddah Central Development Company (JCDC) stands at the forefront of transformative urban development in Jeddah, Saudi Arabia. Under the Public Investment Fund (PIF), it is instrumental in realizing the vision of a modern, vibrant Jeddah. Its portfolio includes stadiums, oceanariums, museums and opera houses.

jeddahcentral.com
Jeddah
Read The Full Story

JCDC And Its Role In The Construction Industry

Jeddah Central Development Company (JCDC) stands at the forefront of transformative urban development in Jeddah, Saudi Arabia. As a pivotal entity under the auspices of the Public Investment Fund (PIF), JCDC is instrumental in realizing the vision of a modern, vibrant Jeddah. Our commitment is reflected in our diverse portfolio, which includes landmark projects such as state-of-the-art stadiums, captivating oceanariums, culturally enriching museums, and innovative opera houses. These projects are not merely constructions; they represent the synergy of cutting-edge technology, sustainable practices, and a deep understanding of urban dynamics. JCDC’s role transcends traditional construction – we are architects of the future, molding the cityscape to resonate with the aspirations of a new era.

Case Study: Implementation Of PMIS At JCDC

The decision by JCDC to implement a sophisticated Project Management Information System (PMIS) ISETIA was guided by the need to integrate and streamline our construction and project management processes, addressing specific gaps left by our existing Enterprise Resource Planning (ERP) SAP system. This case study explores how the chosen PMIS has revolutionized our approach to project control.

Introduction to the PMIS

The PMIS we selected, after thorough evaluation of various options, stands out for its ability to seamlessly integrate with both Building Information Modeling (BIM) and our ERP system, encompassing all aspects of project management from design to operation. This integration is critical in bridging the divide between design, construction, and operational phases, which traditional systems could not adequately address.

Enhancing Project Control and Efficiency

Robust Integration and Interface: The PMIS acts as a central platform, interfacing with various stages and aspects of project management. This has resulted in more coherent and efficient communication and decision-making processes, a crucial factor in large-scale projects.

Advanced Project Management Tools: Equipped with tools for detailed scheduling, on-site management, progress tracking, and comprehensive cost analysis, the system has significantly improved our project planning and execution capabilities. These tools allow for real-time monitoring and adjustments, helping to prevent delays and budget overruns.

Data Analytics and Decision Making: The system’s advanced data processing and analytics capabilities have been instrumental in providing insightful, data-driven strategies for project management, enhancing our ability to make informed decisions and mitigate risks.

Collaboration and Transparency: By centralizing project information, the PMIS has fostered a more collaborative environment. This transparency ensures consistency, accountability, and trust among all project stakeholders, which is essential for successful project execution.

Customization and Scalability: Acknowledging the unique demands of each project, the flexibility of the PMIS to be customized to specific project requirements has been pivotal in managing the diverse portfolio of JCDC projects.

Management Weekly Magazine and Live Reporting: JCDC has also adopted advanced reporting tools, including Management Weekly Magazine for Project Control. These tools offer live, online reports, providing stakeholders with up-to-date information on project progress, budget status, and risk management. This real-time reporting enhances transparency and facilitates more informed decision-making.

Through the integration of this PMIS, JCDC has taken a significant step forward in digitalizing and enhancing our project control processes. This technological advancement has not only streamlined our operations but has also positioned us to tackle complex projects with increased efficiency and effectiveness.

The JCDC ISETIA PMIS system as a common data environment joining the project owner, designer, PMC, investment operator, supplier, general contractor, sub contractors and project team

Integration Of Advanced Technologies And Process

At JCDC, we have pioneered the integration of advanced technologies in project control, notably in the realms of Building Information Modeling (BIM) and cost control processes. This integration has positioned JCDC as a global leader in innovative project management practices.

Innovative 5D Process Integration

JCDC has achieved a significant milestone by becoming the first organization worldwide to integrate cost control processes with BIM, effectively implementing a 5D process. This integration facilitates a holistic view of the project, combining the 3D BIM model with time scheduling (4D) and cost information (5D).

Our system leverages Earned Value Management (EVM) and key performance indicators such as Schedule Performance Index (SPI) and Cost Performance Index (CPI). These methodologies enable us to track the status of project costs directly on the BIM model. For instance, if a particular element is incurring more cost than planned, this discrepancy is immediately visible and actionable.

Real-time Tracking and Management

The integration allows for real-time tracking of payment statuses, work-in-place reports (WIER), payment application forms (PAF), change requests, and accruals, all monitored within the 3D model. This feature is not merely a technological achievement but a transformative approach to project management, enhancing transparency and efficiency.

Unlike other projects where BIM and cost control are implemented separately, our platform unifies these aspects. The application of cost KPIs directly on the 3D model enables cost executives to visually monitor the financial status of contracts, greatly enhancing understanding and decision-making.

Facility Management and Construction Phase Monitoring

This technological integration extends beyond planning and execution to encompass facility management monitoring during the construction phase. By visualizing and tracking all elements in real-time, we substantially increase transparency and empower management to respond swiftly to any delays or discrepancies.

This approach significantly contributes to delivering projects on time by minimizing contingency costs and enhancing the analysis of contractor performance and progress. Furthermore, it streamlines the payment approval process, reducing administrative delays and facilitating smoother financial operations.

In conclusion, the innovative integration of BIM with cost control and time management by JCDC represents a significant advancement in construction project management. This approach not only ensures more effective and efficient project delivery but also sets a new benchmark for industry practices in project control.

Digital Transformation In Cost Control

JCDC’s commitment to digital transformation in cost control is a testament to our dedication to leading the industry in project management innovation. This transformation is not only about adopting new technologies; it’s also deeply rooted in the expertise and continuous development of our team.

Expertise and Professional Development

Recognizing the value of experience and specialized knowledge, JCDC places significant emphasis on recruiting professionals with advanced skills in cost control and analysis. Many of our employees and engineers bring valuable insights from their previous roles and have enhanced their expertise by completing certifications from reputable organizations like AACE.

In line with this, JCDC invests heavily in training programs aligned with PMI and AACE standards to ensure our staff are well-versed in the latest project management methodologies. This focus on continuous learning ensures that our team remains at the forefront of industry advancements.

Pioneering BIM Integration in KSA

While BIM was a relatively new concept in Saudi Arabia, JCDC recognized its potential early on. Our management understood that successful project control begins at the very early stages of a project, necessitating an integrated approach from planning and design to construction and operation.

To bring this vision to fruition, JCDC formed a dedicated team to explore the possibility of integrating cost control from design to operation. Our research indicated a gap in the market for such an integrated solution, leading us to develop and implement a comprehensive approach.

Implementing Advanced Technologies

The selection and implementation of the PMIS system was a crucial step in this journey. The system integrates advanced technologies like Virtual Reality (VR), Internet of Things (IoT), Artificial Intelligence (AI), and Point Cloud technology, providing a multifaceted platform for comprehensive project management.

This integration enables JCDC executives to open a project’s 3D model and instantly access a wealth of information: quality indexes, cost comparisons to plans, health and safety issues, change orders, payment statuses, and more. By color-coding elements, management can quickly assess the Schedule Performance Index (SPI) and Cost Performance Index (CPI), facilitating immediate and informed decisions.

Benefits of Digitalization in Cost Control

The digitalization of cost estimation and control processes at JCDC has markedly increased efficiency, transparency, and the ability to make swift decisions. It has transformed how status is understood and how collaboration occurs in real time.

The 'bottom-up' cost control approach allows management to monitor engineering, procurement, and construction aspects seamlessly. Each element’s cost, man-hours, and progress are meticulously recorded and integrated into the model, offering a comprehensive view of the entire project lifecycle.

In conclusion, JCDC’s digital transformation in cost control is not just a technical upgrade; it is a strategic move that integrates advanced technology, professional expertise, and a commitment to continuous improvement. This approach has revolutionized our project management processes, setting a new standard in the construction industry.

Procurement And Contract Control With PMIS

The implementation of the Project Management Information System (PMIS) at JCDC has significantly enhanced our procurement and contract control processes. This system has streamlined operations, improved transparency, and augmented the efficiency of our procurement strategies.

Enhancing Procurement Processes

Centralized Data Management: PMIS serves as a centralized platform for managing procurement data. It consolidates all vendor information, contracts, purchase orders, and payment schedules, ensuring easy access and management.

Vendor Evaluation and Selection: The system facilitates the evaluation of vendors based on various criteria such as past performance, pricing, and reliability. This structured approach ensures that JCDC collaborates with the best-suited vendors for each project.

Automated Workflows: Automated workflows in the PMIS system enable efficient processing of procurement activities, from requisition to approval and order placement. This automation reduces processing times and minimizes manual errors.

Streamlining Contract Control

Contract Management: PMIS aids in the creation, negotiation, and management of contracts. It allows for real-time tracking of contract statuses and obligations, ensuring that all parties adhere to agreed terms.

Change Order Management: The system effectively handles change orders, providing a transparent and auditable trail of any modifications to contract terms, scope, or costs.

Payment Tracking and Compliance: PMIS also tracks payment schedules and compliance with contract terms, ensuring timely payments and minimizing disputes.

Case Example: Infrastructure Development Project

In a recent large-scale infrastructure development project, JCDC utilized PMIS to manage over 50 contracts simultaneously. The system enabled effective coordination among various contractors and suppliers, maintaining a consistent flow of materials and services.

The project faced a significant change in scope due to unforeseen site conditions. PMIS facilitated efficient management of this change order, enabling quick adjustments to contracts, schedules, and budgets without derailing the project timeline.

The result was a successful project completion that met all quality standards, within the revised budget and schedule, showcasing the efficacy of PMIS in handling complex procurement and contract challenges.

In conclusion, the PMIS system at JCDC has been instrumental in revolutionizing our procurement and contract control processes. By leveraging this system, we have enhanced our efficiency, accuracy, and responsiveness in these crucial areas of project management, contributing significantly to the successful delivery of our projects.

Conclusion: Quantifiable Benefits

Throughout this paper, we have explored JCDC’s innovative approaches in project control, emphasizing the integration of advanced technologies and methodologies. The implementation of these innovations has yielded significant, quantifiable benefits, enhancing various aspects of construction project management.

  • Increased Cost Estimation Accuracy: Implementing innovation processes and technology has led to an improvement in cost estimation accuracy by up to 25%.
  • Enhanced Decision-Making: Decision-making speed and accuracy have improved by approximately 30% due to better data availability and analytics.
  • Minimized Construction Waste: Innovation in project control has contributed to a reduction in construction waste by up to 8%.
  • Boosted Resource Efficiency: Efficient resource management has seen an increase in overall resource efficiency by 15%.
  • Accelerated Decision-Making: The time taken for decision-making has been reduced by 35%, enhancing project momentum.
  • Improved Collaboration: Enhanced collaboration tools have led to a 30% improvement in teamwork and stakeholder engagement.
  • Reduced Contingency Costs: A reduction in contingency costs by 4%, contributing to more predictable project budgets.
  • Streamlined Payment Processing: The time for processing payments has been reduced by 25%, aiding in financial fluidity.
  • Faster Vendor and Material Selection: Efficiency in vendor and material selection has increased by 22%.
  • Minimized Risk of Cost Overruns: The risk of cost overruns has been reduced by 20%.
  • Improved Project Scheduling: Project scheduling accuracy has increased by 20%, leading to more reliable timelines.
  • Enhanced Compliance Management: Compliance with regulatory standards has improved by 15%, mitigating legal risks.
  • Reduced Labor Costs: Efficient project management has led to a reduction in labor costs by up to 10%.
  • Increased Stakeholder Satisfaction: Stakeholder satisfaction levels have risen by 25% due to more transparent and efficient project handling.
  • Better Risk Management: Overall risk management efficiency has improved by 25%, ensuring smoother project execution.
  • Elevated Quality Standards: Quality of construction and final output has improved by 18%.
  • Optimized Supply Chain Management: Supply chain efficiency has been boosted by 20%, ensuring timely availability of materials.
  • Decreased Project Lifecycle Duration: Overall project lifecycle duration has been shortened by 15%, leading to faster project completion.
  • Increased Competitive Edge: JCDC’s competitive position in the market has strengthened by 25%.
  • Sustainable Construction Practices: Implementation of sustainable practices has increased by 20%, contributing to environmental conservation.

In conclusion, JCDC’s journey in integrating innovative project control methodologies and technologies demonstrates a commitment not only to project success but also to industry leadership. The quantifiable benefits achieved resonate beyond immediate project parameters, contributing to setting new industry benchmarks and shaping future project management trends.

These percentages are based on industry standards, thorough investigations, and local experiences, validated by surveys conducted with selected experts.

JCDC’s commitment to implementing innovative processes and technology has not only proven beneficial in tangible metrics but has also set a new precedent in the construction industry.

The impact of these innovations extends beyond JCDC, offering insights and benchmarks for the broader industry. As we continue to push the boundaries of technology and efficiency, we contribute to the evolution of construction project management, setting a new standard of excellence for the industry.